Home / Market Power Brief

Custom research · one market

Market Power Brief

The power picture for one U.S. data-center market: what's running, what's queued, how long new loads wait, and how it stacks up against the markets you compete with.

Written by Eugene Barber · built from public, cited sources · delivered as a PDF in 7 business days

Every data-center conversation now runs into the same question: can the grid actually serve it, and when? The public answer is scattered across utility filings, grid-operator queue reports, county agendas and broker market reports. A Market Power Brief pulls it together for the one market you care about, with every figure traced to its source.

It's built for economic development teams preparing for prospects or board decisions, site selectors shortlisting markets, and developers and investors sizing up a new region.

What's in it

Delivered as an 8–12 page PDF, with an optional 30-minute walkthrough call and follow-up questions answered by email for 30 days.

Read a full sample: Northern Virginia

The complete brief, free: Dominion's new large-load rules, 53.8 GW of data-center demand in contracting, Loudoun's proposed pause, water, and a side-by-side with Atlanta, Central Ohio and Dallas–Fort Worth. 67 cited sources.

Download the sample (PDF) ↓

How it works

  1. Check out below. Within 1 business day you'll get an email to confirm your market and the 3 comparison markets.
  2. If there isn't enough public data to do your market justice, you'll hear that before any work starts and get a full refund.
  3. The brief arrives within 7 business days of confirming scope.

$850 per market

One market, three comparisons, every figure cited. Includes a 12-Month Pass to the full report.

Order a brief →

Questions first? Email hello@gridlas.com.

Not sure yet? Read the Northern Virginia sample, or browse the free regional pages, like Northern Virginia, Texas and the ERCOT queue or Memphis, to see how the research is sourced. The full report, included with every brief, ranks the top 15 metros at a higher level.

Frequently asked

Which markets can you cover?

Any of the 16 markets on the regions page, and most other U.S. metros or counties with active data-center development. If public data is too thin, you'll be told before work starts and refunded.

Is this an interconnection or engineering study?

No. It's desk research from public sources: EIA, LBNL, grid-operator and utility filings, CBRE and public records. It isn't a load-flow or interconnection study, an engineering assessment or legal advice, and it can't promise power at a specific site.

Can I share it?

Yes, within your organization, including with your board, clients and partners. You can quote it publicly with attribution to Gridlas.

Can I pay by invoice?

Yes. Email to ask for an invoice instead of checking out online.

Gridlas · independent & unaffiliated · built from public data. · Methodology & sources →